ICON GROUP LLC launches its own manufacturing operations
A separate production division is established in Konakovo, Tver Oblast, and the company’s first polymerization (powder coating) chamber is acquired.
November
2016
The company's welding production line is commissioned
December
2016
The first product prototypes are manufactured
The first major tender is secured — a residential building at Marshala Zakharova Street.
June
2017
The first TRUMPF V1300 press brake is acquired
Which to this day ensures high bending precision and production reliability.
August
2017
Door supply is completed for the NEVA TOWERS project
October
2017
The first laser cutting machine is acquired
November
2017
The manufacturing division is incorporated as a separate legal entity — ICON DOORS LLC
Production relocates to a new facility in Klin, with the floor area expanding to 2,000 m².
May–July
2018
The company expands its product range
Production of stainless steel elevator portal frames and light panels is launched for the VANDER PARK residential complex.
December
2018
An automatic SALVAGNINI P4 panel bender is acquired
2019
The equipment fleet is expanded with a second laser cutting machine and a second polymerization (powder coating) chamber
June
2020
A production line for concealed aluminum flush hatches (finished-surface access doors) is commissioned
August
2020
In-house production of MDF panels with various finish options is launched
PVC film, plastic laminate, veneer, and RAL spray coating.
2021
In-house production of stainless steel 3D hinges (BSW/ECO equivalents) is mastered
Proprietary manufacturing of concealed hinges in multiple configurations is launched, and a full in-house product line for various door types is established.
2022–2023
Technological development continues:
a third laser cutting machine (HANS) is acquired, along with BAYKAL 160T and DENER press brakes.
April
2024
A Chinese-manufactured AIOTEK panel bender is acquired
2025
A full upgrade of the laser cutting machine fleet is carried out
A new 3-meter-height spray coating line is ordered, designed for the production of oversized doors and structural assemblies.
2026
Production and supply of products for the Badeevsky residential complex commences
— one of Moscow’s landmark architectural projects.